macOS 14 or later on Apple Silicon
This build does not support Intel Macs or macOS 13 and earlier. Start the target HTTP/HTTPS service and confirm that your Mac can reach it directly. Your network must also permit the connection to Cloudflare.
Download and verify SHA-256
Download ZhiHua-JieSuo-4.1.3-macOS-arm64.zip (approximately 21.7 MB). Before the first launch, run this command in Terminal:
shasum -a 256 ~/Downloads/ZhiHua-JieSuo-4.1.3-macOS-arm64.zip77db2aa9e6c7a51d7a95efdfd27d329f3a22e7982b689603d32a612650506338The result must exactly match the SHA-256 published on this page. If it differs, do not open or run the file; delete it and download it again from the official website. A matching hash helps detect corruption or replacement but does not, by itself, prove that software is safe.
Install the app in Applications
Extract the ZIP
Double-click the ZIP to extract the app. Install it in a regular application location rather than running it from a temporary browser-download folder.
Move the app
Open the extracted folder and drag the app into the Applications folder in Finder.
Open from Applications
Open Applications and double-click the app. If macOS blocks it, read the security section before deciding whether to continue.
Review the usage limits
Read the initial usage notice, privacy information and public-exposure warning before continuing to the main window.
If macOS cannot verify the app
The public build uses a local ad-hoc signature and is not signed with an Apple Developer ID or notarized. Only consider overriding the warning if you trust the source, the SHA-256 matches and you understand the risk. After an attempted launch, macOS may offer Open Anyway in System Settings > Privacy & Security. Check the app name. Do not override a warning for an unknown download, a hash mismatch or a specific malware detection; never disable security controls globally.
Configure and start your first tunnel
127.0.0.1 refers to this Mac. To reach another device on your local network, enter that device's IP address and first confirm that this Mac can access it directly.
| Example | Protocol | IP or hostname | Port |
|---|---|---|---|
| Local frontend | Automatic | 127.0.0.1 | 3000 |
| API | HTTP | 127.0.0.1 | 8080 |
| Local HTTPS service | HTTPS | 127.0.0.1 | 8443 |
| LAN device page | Automatic | 192.168.1.20 | 80 |
- Open the local URL in this computer's browser and confirm that the target service is running.
- Add the local service in ZhiHua JieSuo, check its status, and start it only if you own it or have permission to share it.
- Wait for the status to change from Checking to Connecting and then Running.
- Copy the generated
https://*.trycloudflare.comURL and test it from another network. - Stop the service when testing or the demonstration is finished. The temporary URL will stop working.
Protocols, HTTPS and multiple services
Select Auto if you do not know the local protocol, or choose HTTP or HTTPS explicitly. The public endpoint uses HTTPS; the connection from the client to the local service uses the selected protocol. Allowing a self-signed local certificate disables certificate verification for that local connection. Use this option only for a local target you understand and trust.
Use the plus button beside the service list to add another service. Each entry has its own name, IP address, port, protocol, tunnel process and random public URL. Stop a running service before editing or deleting it.
Service status and troubleshooting
Read the latest red or yellow entry in the run log. Check the local address first, then the tunnel connection and public-URL check. Change one condition at a time so that you can identify the cause.
Stop, quit and uninstall
Stop an individual service or choose Stop All. Closing the main window does not quit the app; use the app menu or Command + Q. To uninstall, quit the app and move it to Trash. If you also want to remove saved settings, check ~/Library/Preferences/cn.zhuatech.jiesuo.plist.
Security, privacy and usage limits
- Use only for authorized development, integration testing, demonstrations and short-term sharing. Not for production use.
- Only HTTP/HTTPS web services are supported. This is not a VPN and does not provide general TCP/UDP forwarding.
- ZhiHua JieSuo does not add a password or authentication to the public URL. Anyone who knows the URL may be able to access the exposed service.
- Do not expose databases, router or device administration pages, unprotected backends, confidential files or sensitive data.
- Expose only services you own or are explicitly authorized to share. Do not use the tool for unauthorized access, attacks, concealed proxying or unlawful activity.
- Traffic passes through Cloudflare and is subject to its terms, privacy policy and technical limits.
macOS frequently asked questions
What should I check if the local service is unreachable?+
Open the local address directly in your Mac browser, for example http://127.0.0.1:3000. Check that the service is running, the IP and port are correct, and HTTP/HTTPS matches the target. For LAN devices, also check firewall rules and network reachability.
Why is no public URL being generated?+
Read the latest error in the run log. Confirm that your network permits Cloudflare Tunnel connections, stop the service and retry. Ask your network administrator about restrictions rather than bypassing them.
Why does the public URL return 502 Bad Gateway?+
A 502 response usually means the tunnel exists but cannot reach the local service. Check the local service, port, protocol and any self-signed HTTPS certificate.
Why is Intel Mac not supported?+
The public package is built for Apple Silicon arm64, including M1, M2, M3, M4 and later Apple Silicon chips. Do not try to bypass the processor-architecture requirement on an Intel Mac.
Where can I find Open Anyway?+
After an attempted launch, check System Settings > Privacy & Security. Open Anyway may be available for a limited time after a block. Use it only if you trust the app and have verified its source and hash; a matching hash alone does not prove safety.
Official references
- Apple: safely open apps on your MacApple Support
- Cloudflare Quick Tunnels documentationCloudflare Developers