Home / Products / ZhiHua JieSuo
Official free toolmacOSWindows

ZhiHua JieSuo

Create a temporary public HTTPS URL for an HTTP/HTTPS service on your computer or local network. Use it for software development, API integration, mobile testing, webhook callbacks, client demonstrations and authorized device testing.

Use only for authorized development, integration testing, demonstrations and short-term sharing. Not for production use.
Contact
OFFICIAL DOWNLOAD

Choose the version for your computer

Check your operating system and processor architecture before downloading. The macOS and Windows clients are released independently and have different version numbers.

MAC
macOS

macOS on Apple Silicon (arm64)

macOS 14 Sonoma or later on Apple Silicon, including M1, M2, M3, M4 and later Apple Silicon chips.

Current Version
v4.1.3
File Size
21.7 MB
Release date
2026-08-09
License
Free to use
Download for macOSv4.1.3 · 21.7 MB
SHA-25677db2aa9e6c7a51d7a95efdfd27d329f3a22e7982b689603d32a612650506338

Not compatible with Intel Macs or macOS 13 and earlier.

WIN
Windows

Windows x64

64-bit Windows 10 or Windows 11. Microsoft Edge WebView2 Runtime is required.

Current Version
v2.0.1
File Size
20.8 MB
Release date
2026-08-09
License
Free to use
Download for Windowsv2.0.1 · 20.8 MB
SHA-256287292c34c4ac4ae24955b22743e591a6d38c7801910e371f7bd89534736573b

Not compatible with 32-bit Windows or Windows 7/8. This is not a native Windows ARM64 build.

About operating-system security warnings

The public macOS build is not signed with an Apple Developer ID or notarized, and the Windows build does not have a commercial code-signing certificate. Your system may warn about an unverified developer, unknown publisher or SmartScreen reputation. Verify the download source and SHA-256 before deciding whether to proceed. A matching hash is not a guarantee of safety. Do not disable security software or ignore a specific malware detection.

WHAT IT DOES

Share a local web service through a temporary HTTPS URL

ZhiHua JieSuo is a desktop interface for temporary tunnels. Enter a local IP address, port and protocol; the app uses its bundled cloudflared component to start a Cloudflare Quick Tunnel and display a randomly assigned public URL.

01Local service

First confirm that the HTTP/HTTPS service is reachable from this computer.

→
02ZhiHua JieSuo

Check the local port and start a separate temporary tunnel process.

→
03Temporary HTTPS URL

Share the temporary URL for authorized testing, demonstrations or short-term review.

Connection diagram (illustration)
Icon for SWAT products
ZhiHua JieSuoTemporary public tunnel
Local servicehttp://127.0.0.1:3000Reachable
LOCALHTTPS TUNNELPUBLIC
Temporary public URLhttps://random.trycloudflare.com
Tunnel runningThe URL stops working when the tunnel stops.
USE CASES

When to use a temporary public URL

Designed for short-term access during development and delivery, not as a replacement for a production deployment.

01

Frontend and API integration

Let mobile developers, frontend developers or remote teammates test a local development service.

02

Client demonstrations and review

Demonstrate work in progress or review a workflow before deploying it to a production environment.

03

Webhook testing

Provide a temporary HTTPS callback URL when testing integrations that require a public endpoint.

04

Authorized LAN device testing

Temporarily access an HTTP/HTTPS page on a LAN device you are authorized to test.

CAPABILITIES

Included features

✓No Cloudflare account, token, domain name or public server required
✓Multiple independent local HTTP/HTTPS services
✓Protocol detection and an option for trusted self-signed local HTTPS certificates
✓Random temporary HTTPS URLs under trycloudflare.com
✓Bundled cloudflared component; no separate component download required
✓Service checks, run logs, URL copying and browser testing
QUICK START

From download to your first public URL

Both platforms use the same basic workflow, with different installation steps.

01

Download and verify

Choose the package for your operating system and verify it against the published SHA-256.

02

Install or extract the package

On macOS, move the app to Applications. On Windows, extract the entire ZIP before running the app; do not copy out only the EXE.

03

Enter your local service

Enter a service name, the local or LAN IP address and port, then select Auto, HTTP or HTTPS.

04

Start the temporary tunnel

Check that the local service is reachable, read the public-exposure warning and start the tunnel. Wait for the temporary HTTPS URL.

05

Test the link, then stop the service

Copy and test the URL. Stop the service when finished; the temporary URL will no longer be available.

FAQ

Frequently asked questions

Review the supported features and security limits before downloading.

Is ZhiHua JieSuo free to use?+

Yes. The public macOS and Windows builds are free to download from the ZhiHua Tech website. A Cloudflare account, token, domain name or public server is not required. The tool uses Cloudflare Quick Tunnels for temporary development access and does not provide a production SLA.

How is it different from a VPN or remote desktop?+

ZhiHua JieSuo exposes a specific HTTP/HTTPS web service. It does not create a virtual network for the whole computer or provide remote desktop control, and it does not forward arbitrary TCP/UDP ports.

Will the public URL remain available permanently?+

No. The random trycloudflare.com URL is temporary. It may stop working or change when you stop the service, quit the app, lose connectivity or restart the tunnel. Production systems need a separately designed deployment with access control, monitoring and appropriate service guarantees.

Can I expose company administration or device-management pages?+

Do not expose sensitive administration pages. The tool does not add authentication, and anyone with the URL may reach the service. Share only explicitly authorized test services with appropriate access controls already in place.

Why do the macOS and Windows versions differ?+

The macOS and Windows clients are built and released separately, so their version numbers do not need to match. Use the version, processor architecture and SHA-256 listed for your operating system.

THIRD-PARTY SERVICE

About Cloudflare Quick Tunnels

The app bundles cloudflared to start a Quick Tunnel. Cloudflare independently provides the public endpoint and network transport. ZhiHua Tech is not affiliated with Cloudflare, and this tool does not imply Cloudflare endorsement or a service guarantee. Cloudflare terms, privacy policy and technical limits also apply.

Cloudflare Quick Tunnels documentation
EmailWhatsApp