Home / Products / ZhiHua JieSuo / Windows installation guide
WINDOWS INSTALLATION GUIDE

ZhiHua JieSuo Windows Guide

For 64-bit Windows 10 and Windows 11. This guide covers the official download, SHA-256 verification, complete extraction, SmartScreen notices, WebView2, local service settings and troubleshooting.

Version 2.0.1Windows x6420.8 MBUpdate to 2026-08-09
Contact
Confirm before we start.

Windows 10/11 x64 and WebView2

This build does not support 32-bit Windows or Windows 7/8 and is not a native Windows ARM64 build. Start the target HTTP/HTTPS service and confirm that this computer can reach it directly. The interface also requires Microsoft Edge WebView2 Runtime.

DOWNLOAD & VERIFY

Download and verify SHA-256

Download ZhiHua-JieSuo-2.0.1-Windows-x64.zip (approximately 20.8 MB). Open PowerShell in your download folder and run:

PowerShell commandGet-FileHash '.\ZhiHua-JieSuo-2.0.1-Windows-x64.zip' -Algorithm SHA256
Official SHA-256287292c34c4ac4ae24955b22743e591a6d38c7801910e371f7bd89534736573b

The result must exactly match the SHA-256 published on this page. If it differs, do not open or run the file; delete it and download it again from the official website. A matching hash helps detect corruption or replacement but does not, by itself, prove that software is safe.

INSTALLATION

Extract the complete package before running

01

Extract the complete ZIP

Right-click the ZIP and choose Extract All. Use a regular folder, such as Documents or a tools folder. Do not run the EXE from inside the ZIP, because its dependencies may not be found.

02

Keep all bundled files together

Keep the main program, cloudflared.exe and all other bundled files in their extracted folder. Do not move only the EXE to your desktop.

03

Launch the app

Double-click the main program. If Windows displays a warning, verify the download source and SHA-256, then read the security guidance below.

04

Configure and start a service

Read the usage limits, enter the service name, IP address, port and protocol, and confirm local reachability before starting the temporary tunnel.

WINDOWS SECURITY

If Microsoft Defender SmartScreen shows a warning

Do not disable antivirus or SmartScreen

The public build does not have a commercial code-signing certificate, so Windows may report an unknown publisher or show a SmartScreen warning. Do not treat this as proof that the app is safe or malicious. Verify the official source and SHA-256, read the warning and follow your organization's security policy before deciding whether to proceed. If a specific threat is detected, the source is unknown or the hash differs, do not run the file. Never disable antivirus or SmartScreen globally.

WEBVIEW2

If the window is blank or the app will not start

If the app shows a blank window, reports that WebView2 is missing or closes immediately, install or repair Microsoft Edge WebView2 Runtime using the official Microsoft download page, then restart the app. Use Microsoft's Evergreen installer rather than an unofficial runtime download.

FIRST CONNECTION

Configure and start your first tunnel

127.0.0.1 refers to this Windows computer. For another device on your local network, enter that device's IP address and verify it directly in this computer's browser first.

ExampleProtocolIP or hostnamePort
Local frontendAutomatic127.0.0.13000
APIHTTP127.0.0.18080
Local HTTPS serviceHTTPS127.0.0.18443
LAN device pageAutomatic192.168.1.2080
  1. Open the local URL in this computer's browser and confirm that the target service is running.
  2. Add the local service in ZhiHua JieSuo, check its status, and start it only if you own it or have permission to share it.
  3. Wait for the status to change from Checking to Connecting and then Running.
  4. Copy the generated https://*.trycloudflare.com URL and test it from another network.
  5. Stop the service when testing or the demonstration is finished. The temporary URL will stop working.
PROTOCOL & MULTI-SERVICE

Protocols, HTTPS and multiple services

Select Auto if you do not know the local protocol, or choose HTTP or HTTPS explicitly. The public endpoint uses HTTPS; the connection from the client to the local service uses the selected protocol. Allowing a self-signed local certificate disables certificate verification for that local connection. Use this option only for a local target you understand and trust.

Add a separate entry for each authorized web service, such as a frontend or API. Each entry has its own IP address, port, protocol, tunnel process and random public URL. Stop a running service before editing or deleting it.

STATUS & TROUBLESHOOTING

Service status and troubleshooting

Not startedNo tunnel has been started
CheckingChecking the local settings
ConnectingRequesting a temporary URL
RunningThe tunnel is running; test the public URL
Local service unreachableThe target IP, port or service cannot be reached
Public URL check failedThe public URL did not pass its connectivity check
Start failedCheck configuration, dependencies and network access

Read the latest red or yellow run-log entry. A 502 response usually means the tunnel exists but cannot reach the local service. If no public URL is generated, ask whether the network, firewall or endpoint policy blocks cloudflared.exe from connecting to Cloudflare.

DATA & UNINSTALL

Configuration, logs and uninstalling

Configuration is normally stored in %APPDATA%\知华界梭\profiles.json, and logs in %APPDATA%\知华界梭\app.log. Remove sensitive addresses or data from log copies before sharing them for support. To uninstall, stop all services, quit the app and delete the extracted program folder. Delete the corresponding AppData folder only if you also want to remove saved settings; this removes the saved service list.

SECURITY BOUNDARIES

Security and usage limits

  • Use only for authorized development, integration testing, demonstrations and short-term sharing. Not for production use.
  • Only HTTP/HTTPS web services are supported. This is not a VPN and does not provide general TCP/UDP forwarding.
  • ZhiHua JieSuo does not add a password or authentication to the public URL. Anyone who knows the URL may be able to access the exposed service.
  • Do not expose databases, router or device administration pages, unprotected backends, confidential files or sensitive data.
  • Expose only services you own or are explicitly authorized to share. Do not use the tool for unauthorized access, attacks, concealed proxying or unlawful activity.
  • Traffic passes through Cloudflare and is subject to its terms, privacy policy and technical limits.
FAQ

Windows frequently asked questions

Can I move just the main EXE to the desktop?+

No. Keep the complete extracted folder, including the bundled cloudflared component and other dependencies. You can create a desktop shortcut to the main program, but do not move the EXE out of that folder.

Does an unknown-publisher warning mean the file is a virus?+

An unknown-publisher notice usually means Windows cannot verify a trusted code-signing publisher. It is not, by itself, proof of safety or malware. Verify the official source and SHA-256 and follow your security policy. Do not run a file with a hash mismatch, unknown origin or specific threat detection.

What should I do if the window is blank or the app closes?+

Install or repair Microsoft Edge WebView2 Runtime and restart the app. If the problem continues, check the application log under AppData and confirm that you are using a supported 64-bit Windows 10/11 system.

Why does the public URL return 502?+

A 502 response usually means the Cloudflare tunnel is running but the app cannot reach the local service. Open the target IP address and port in the same computer's browser, then check the protocol, port and local firewall.

What if the tunnel cannot connect on a company network?+

Your network may restrict Cloudflare Tunnel connections. Ask the network administrator to check the policy. Do not disable endpoint security or bypass organizational network controls.

REFERENCES

Official references

  1. Microsoft Edge WebView2 documentationMicrosoft Developer
  2. Cloudflare Quick Tunnels documentationCloudflare Developers

Ready to use ZhiHua JieSuo on Windows?

Check your operating system, architecture, SHA-256, WebView2 Runtime and usage limits before downloading from the official link.

Download for Windowsv2.0.1 · 20.8 MBContact
EmailWhatsApp