Asset Preservation
Secure assets and contain immediate business risksConfirm authorization, preserve code and database backups, and inventory servers, domains, certificates, keys and third-party accounts. Record the current state.
We assess and take over delayed or unfinished software projects, systems that cannot go live, and codebases with missing documentation. First, we secure the available code, accounts, data and environments. An independent technical assessment then establishes what works, what is missing and whether repair, refactoring or replacement is practical.
A brief description of the problem, your current systems and the intended timeline is enough to start a discussion. Do not send passwords or sensitive production data.
AI-generated prototypes need the same database, access-control, testing and deployment checks as other software. Applications that use AI also need a review of model credentials, prompts, knowledge sources and running costs. ZhiHua can assess reusable components, repair critical workflows or refactor selected modules. A working homepage does not establish completion, and not every prototype is worth continuing.
The checks below explain the implementation scope and acceptance requirements. Read the implementation checks
Do not commit to a full rescue price before reviewing the code, data and environment. Secure the available assets first, then carry out a defined technical assessment. Build reproducibility, completion, security risks and migration costs determine whether to repair, refactor or rebuild.
Reduce uncertainty in stages before agreeing the full investment and delivery model.
Confirm authorization, preserve code and database backups, and inventory servers, domains, certificates, keys and third-party accounts. Record the current state.
Try to reproduce the build and deployment. Review architecture, dependencies, data, security, defects and gaps against requirements, then produce a prioritized risk register.
Repair critical workflows first, restore testing and release capability, and plan migration, recovery and handover.
Unverified code, damaged data, external dependencies and security issues may limit the recovery scope. Findings discovered during diagnosis are recorded and handled through the agreed change process; unverified assets do not receive an unconditional quality guarantee.
Confirm lawful access to code, platform configuration, accounts and data, then reproduce the application in an isolated environment. A demo cannot establish completion percentage, and not every project is worth extending.
| Function | Employee action | Delivery and safeguards |
|---|---|---|
| Inventory existing assets | Inventory repositories, workflows, knowledge sources, model configuration and known issues. | Asset register showing received, verified, missing and unlicensed items. |
| Reproduce one business task | Inspect the path from input through retrieval and tools to the business record. | Reusable modules, failure points and blocking dependencies beyond the chat screen. |
| Plan staged repairs | Separate configuration fixes, API development, access controls and necessary redesign. | Findings, phase scope, pricing assumptions and deferred items. |
| Verify maintainability | Have the receiving team deploy, test key tasks and restore the system using the supplied materials. | Code, platform configuration, prompt versions, knowledge-processing rules, evaluation sets and deployment instructions. |
Handover does not imply ownership of third-party platform source or model weights. Clarify project assets, supplier licences and client accounts separately. Do not send production secrets or complete customer data in ordinary inquiries.
AI asset handover checklist → · Post-release AI operations and improvements →
Source code, account access, environments or data assets are incomplete.
There is no reliable assessment of code quality or completed requirements.
Builds and releases depend on undocumented manual steps.
Production incidents recur without adequate monitoring or response procedures.
There is insufficient evidence to choose between repair and redevelopment.
Take over authorized source code, repositories, accounts, domains, certificates and environments.
Audit code quality, architecture, databases, dependencies and security.
Check completed requirements, defects and release blockers.
Restore reproducible builds, environments and automated deployment.
Repair or refactor agreed features and address performance and security issues.
Plan and test data backup, validation, migration and recovery.
Complete documentation, transfer knowledge and establish ongoing development.
Handle urgent incidents and prioritize business continuity within the agreed scope.
Use these related services and guides to compare scope, implementation options and budget considerations for your project.
The contract defines the deliverables for the agreed scope and project stage. Typical items are listed below.
The initial asset and code assessment, the critical workflow to restore, and the boundaries of the first recovery phase.
The condition of the existing code, data, systems and documentation, and the amount of auditing, migration or refactoring required.
Third-party integrations, test access, supplier coordination, data quality and the recovery work needed when an operation fails.
Performance, availability, security, access control, audit, compliance and permitted release windows.
Testing, migration, recovery and acceptance evidence, plus architecture, API, user and operations documentation. Agree warranty, ongoing operations and further development separately.
Legal authority to access the code, system, accounts or data cannot be demonstrated.
A complete deadline and fixed price are required before an asset and technical assessment is allowed.
New features are requested without addressing high-risk data, security or release problems.
You do not need every document before contacting us. First identify which code, servers, databases, domains and accounts you control. Avoid making unreviewed changes to production.
Distinguish software written with AI assistance from software that uses AI at runtime. A project may include both, but the checks differ. Start with the business functions that must work; do not assume the original stack must be retained or the model replaced. Missing repositories, cloud access or commercial licenses must be documented. A demo or screenshot cannot replace buildable source code and a verified workflow.
Preserve the code version, deployment settings, database backups, dependencies and known incidents. Mark which assets are verified or missing. If credentials have appeared in client code, screenshots or repository history, deleting the visible text is not enough: arrange revocation or rotation. Use sanitized data and least-privilege test accounts in an isolated environment; do not upload full production data to code-generation tools.
For a subscription product, test registration, login, plan selection, payment callbacks, entitlement changes and cancellation end to end. A visible success page does not prove that the backend enforces permissions or verifies and reconciles payments. Check persistent storage, test/production separation and duplicate callbacks. If requirements are missing, reconstruct the critical workflow and its acceptance tests rather than estimating completion from lines of code.
Retain modules that can be reproduced and verified. Repair local gaps such as missing authorization, API contracts or migration scripts. Consider rebuilding components with fundamental data-model, licensing or tenant-isolation problems. AI-generated code is not automatically disposable, but prior spending is not a reason to retain unsafe code. The assessment should identify evidence, blockers, reusable parts, alternatives and phased budgets.
For AI features, keep model credentials and calls behind a controlled backend. Define tenant permissions, usage limits, timeouts and fallback behavior for provider failures or abnormal costs. Handover includes knowledge sources, prompts, model configuration and evaluation records. Require appropriate human confirmation before generated results change orders, quotations or external messages, and isolate untrusted document instructions. Software tests and AI quality evaluations serve different purposes.
Before a limited rollout, reproduce installation, builds, database migrations, critical-path tests and backup restoration from the documentation. Record the release version, configuration, migration sequence and recovery limits. Rolling back code does not necessarily restore changed data. Quote diagnosis, repairs, deployment, migration and ongoing operations as separate scopes with stated assumptions.
Use the checks below to assess the delivered system. They are acceptance recommendations, not client performance results or a universal service-level commitment.
| Checkpoint | Verification | What does not count |
|---|---|---|
| Build Reproducibility | Build the system in a new agreed environment and test critical workflows. | Running only on the original developer's computer is not an independent build. |
| Asset integrity | Check repositories, accounts, data, licenses, configuration and AI assets. | Record missing items and owners; screenshots are not source code. |
| Security and Data Consistency | Test unauthorized access, concurrency, duplicate callbacks, cost limits and migration. | Hiding a button is not backend authorization. |
| Recovery | Restore a backup and verify business records. | Distinguish code rollback from database recovery. |
Project Handover Checklist: verify handover assets and repeatable acceptance evidence. This is a checklist, not a completed client case study.
Each stage has an agreed objective, reviewable outputs and named responsibilities. Key decisions are reviewed before the next stage begins.
Answers to common questions about scope, costs and delivery.
A missing document set does not rule out an assessment. We first need legal authorization and as much of the source code, database, server, domain and third-party account access as is available. Code review, environment reconstruction and user interviews can then help rebuild system knowledge.
Compare business urgency, reusable code, architectural debt, migration effort, compliance risks, schedule and total cost. The recommendation should follow the evidence, not simply the amount already spent.
Urgent work can prioritize backups, isolation, restoration and temporary fixes where access and conditions permit. A fuller audit and longer-term improvement plan can follow. The emergency scope and responsibilities must still be agreed.
Usually a defined code and asset assessment comes first. Once buildability, deployment, data condition and major risks are understood, we can give a more reliable phased repair or rebuild estimate.
Many projects can be assessed, but recovery cannot be promised without examining the assets and code. Preserve authorized code, servers, databases, domains, certificates and third-party accounts, then reconstruct a repeatable environment. Diagnose core workflows, security, data risks and unfinished work before choosing repair, refactoring, migration or replacement.
View full answerAI Consulting, Integration and Software ServicesLong-term maintenance depends on lawful access to the running system, database, servers, accounts and required licenses. Preserve assets and backups before changing production. Restore the build or document runtime dependencies, then assess workflows, data, security and integrations. Until the unknowns are resolved, use a phased plan and risk budget rather than a complete fixed price or strict SLA.
View full answerContracts, payments, changes and project deliveryAsk for working deliverables, remaining tasks, risks and dependencies rather than only a completion percentage. Identify whether delays come from scope changes, missing client inputs, technical problems or delivery management. Agree a verifiable recovery plan and pause non-essential new features. If transparent delivery cannot be restored, preserve the assets and assess a handover.
View full answerContracts, payments, changes and project deliveryRemediation depends on the contract, acceptance criteria, cause of failure and each party's responsibilities. Preserve versions, logs, tests, communications and evidence of business impact. For repairable issues, agree the scope, deadline and retest criteria. Restrict high-risk functionality and obtain an independent technical assessment where security, data or architecture is at risk.
View full answerUnderstand staged estimates for asset preservation, diagnosis, recovery and ongoing improvements.
View detailsTechnical AssessmentUse build, deployment and risk evidence to decide whether to repair or rebuild.
View detailsAsset ChecklistCheck code, accounts, data, environments, APIs, licenses and unfinished work.
View detailsTell us which code, servers, databases and accounts you control. We can first review a safe sequence for environment recovery, code assessment, documentation and phased migration.
You do not need a full specification for an initial discussion. Do not send passwords or unsanitized sensitive information.