It's a good case for first diagnosis.
Preparation of smart equipment or re-stocking
The equipment protocol, gateway and cloud platform route have not been determined
Pilots are operational but not stable deployment or bulk delivery
Need to access equipment data and ERP, MES or business platform
Recommendation pre-commencement readiness
Device model, interface, protocol and data sample
Field network, power supply, environment and installation conditions
Target number, cost, certification and access plan
Existing solids, platforms, operating systems and vendor information
Terms of reference for the diagnosis
01Verification of equipment, protocols, gateways and network conditions
02Data collection, offline caches, relays and consistency assessments
03Comparison of standard hardware with custom hardware routes
04Equipment identity, OTA, surveillance and remote diagnostic design
05Risk assessment for certification, supply of equipment, testing and long-term maintenance
Independent and usable deliverables
The diagnosis does not bind the successor development team and can be used for intra-enterprise project setting, supplier selection or subsequent handover.
DIAGNOSIS OUTPUTList of equipment and protocol accessibility
DIAGNOSIS OUTPUTEnd-to-end technical architecture proposal
DIAGNOSIS OUTPUTPrototype or PoC Certification Range
DIAGNOSIS OUTPUTHardware selection and keyware risk table
DIAGNOSIS OUTPUTList of security, OTA and transport requirements
DIAGNOSIS OUTPUTPilot, test and formal deployment routes
Service boundaries and evidence calibreThe diagnosis is not a substitute for statutory certification, laboratory testing, hardware reliability verification or formal mass evaluation.
Statement of costs and follow-up cooperation
Costs are assessed on the basis of information completeness, scope of review, scale of systems or equipment and validation complexity
The diagnosis can be used independently and does not require ZhiHua Tech to continue.
If a follow-up PoC or a formal project is entered, whether the cost of the diagnosis is offset by the agreement of the parties