R & D, project and system operations

Codex Website Business System Inspection

Checking web pages only for return 200 does not prove that registration, login, tabulation, payment or data synchronization is really available. The Cordex workflow can execute key user paths by script, collect intercepts, responses, logs and results evidence, and notify those responsible when failure is classified. The inspection account number should use isolation data and minimum permissions, and must be set off when real payments or production changes are made.

ZhiHua Tech Original Course1 minute 22 secondsCodex Automation Workstreams

This video is used to understand the idea of Codex automation. Real implementation needs to be designed according to data access, system interfaces, operational risks and manual approval requirements.

DIRECT ANSWER

Let's see what we can do.

Checking web pages only for return 200 does not prove that registration, login, tabulation, payment or data synchronization is really available. The Cordex workflow can execute key user paths by script, collect intercepts, responses, logs and results evidence, and notify those responsible when failure is classified. The inspection account number should use isolation data and minimum permissions, and must be set off when real payments or production changes are made.

VIDEO NOTES

The video content of this issue is read

The following are from the structured text of the original video during the period, which allows for quick reading, internal discussion and search.

1. Opening

The server is online, and does not mean that the user can really do the business.

Issues

The page can be opened and buttons and permissions may still be disabled; traditional surveillance can be based on technical indicators; and after the anomaly, steps and screenshots are missing.

Models

The submission, deletion, payment and change of authority are particularly subject to strict control.

Process

Codex loads the test environment, executes user paths, checks the page and business status, saves the intercept and logs and generates recoverable worksheets.

5. Context

Open websites are frequently operational, internal systems use test accounts, transaction processes should be completed in sandboxes and production environments stopped before confirmation.

6. Technology

Automation of Web process stabilization browsers; use of Computer Use for cross-desk applications; and interface monitoring, worksheet, CI and test data after maturity.

7. implementation

Automate five critical paths first.

8. Closure

The objective of the automatic inspection is to prove that the business is really useful.

WORKFLOW DESIGN

What should we do with this scene?

Organize Bug, Project Risk, Data Reconciliation and System Inspection into a re-emergible, assignable, acceptable engineering workflow. Around “How web sites and business systems automatically inspect key processes”, real input, desired output, tool privileges, manual clearance, unusual processing and business acceptance indicators should be defined before deciding whether to use rules, scripts, API, Codex or other AIAgents.

01How key business processes should be broken down into inspection scripts

The verification of conditions, liability, data sources and exceptions is done using real samples, and the presentation is not used as a substitute for production evidence.

02What evidence to keep when you fail

The verification of conditions, liability, data sources and exceptions is done using real samples, and the presentation is not used as a substitute for production evidence.

03How do we separate the account numbers, test data from production operations?

The verification of conditions, liability, data sources and exceptions is done using real samples, and the presentation is not used as a substitute for production evidence.

IMPLEMENTATION PATH

Suggested paths for improvement

  1. 1
    Collect evidence from logs, data and real operations

    Selecting recent and representative tasks and anomalies, identifying participants, input outputs, time and current costs.

  2. 2
    Definition of severity, responsible person, reliance and acceptance criteria

    Distinction between actions that are self-executing, that require manual confirmation and that prohibit automatic processing.

  3. 3
    Mr. S., Recover and Draft Restoration

    Start with the draft, a copy or a limited scene, and keep the abnormal transferer and retreat.

  4. 4
    Closed loops completed through regression testing, clearance and release of retreat

    Continuous observation of accuracy, adoption, processing cycle, error and real business results.

ACCEPTANCE

How to automate the receipt and inspection is really effective.

The acceptance cannot be based solely on whether a single demonstration runs. The following results should be observed continuously using independent samples and real anomalies, and pre-modification baselines of the same calibre should be maintained:

  • Discovery and recurrence success rate
  • From discovery to entry into processing queue
  • Percentage of automatically recommended manual review
  • Integrity of evidence for return, publication and reversal

The authorization, approval, audit and manual takeover must also be verified when it comes to the amount, customer commitment, privacy, compliance, production change or deletion operations.

RELATED RESOURCES

Continue to learn about the programmes

More details
Focus of the lesson
  • How key business processes should be broken down into inspection scripts
  • What evidence to keep when you fail
  • How do we separate the account numbers, test data from production operations?
Principles of implementation

The manual approval, log and back check are maintained for high-risk actions.

Advisory AI automation programme
EmailWhatsApp