System Adoption After Go Live

Staff are reluctant to use it because the system is being added, processes are not realistic, data are not credible or management requirements are inconsistent.

ZhiHua Tech Original Course2 minutes 58 secondsFAQs and solutions in enterprise informatization

This video is used for enterprise-infomatic knowledge learning and internal discussions.

DIRECT ANSWER

Let's see what we can do.

Staff are reluctant to use it because the system is being added, processes are not realistic, data are not credible or management requirements are inconsistent.

VIDEO NOTES

The video content of this issue is read

The following are structured textual interpretations of the video for the current period that allow for quick reading, internal discussion and search; it is not verbatim subtitled. Around “the system is on line and staff are reluctant to use it, how should it be addressed” it is suggested that a distinction be made between appearances, business causes and system improvements before deciding whether process adjustments, data governance, system integration, automation or customization development are required.

1. The real reasons for not using the system

The user should look at the real task, correct the high frequency barrier and allow managers to use the system data for daily decision-making. This point of judgement should be matched by a real task, document, communication record or system log, which check the frequency, waiting time, back-to-work costs, responsibility and exceptions.

2. How to distinguish between training and products

The user should look at the real task, correct the high frequency barrier and allow managers to use the system data for daily decision-making. This point of judgement should be matched by a real task, document, communication record or system log, which check the frequency, waiting time, back-to-work costs, responsibility and exceptions.

3. How to sustain improvements in the rate of adoption after the line

The user should look at the real task, correct the high frequency barrier and allow managers to use the system data for daily decision-making. This point of judgement should be matched by a real task, document, communication record or system log, which check the frequency, waiting time, back-to-work costs, responsibility and exceptions.

WORKFLOW DESIGN

What should we do with this scene?

Identifying processes and responsibilities behind approval, scheduling, cross-sectoral waiting, project extensions and system usage rates. Around “the system is not available to staff and how it should be addressed”, real input, expected output, tool privileges, manual approval, unusual handling and operational acceptance indicators should be defined before deciding whether to use rules, scripts, API, Codex or other AI Agent.

01The real reason for not using the system

The verification of conditions, liability, data sources and exceptions is done using real samples, and the presentation is not used as a substitute for production evidence.

02How to distinguish between training and product issues

The verification of conditions, liability, data sources and exceptions is done using real samples, and the presentation is not used as a substitute for production evidence.

03How does the rate of adoption continue to improve after the line?

The verification of conditions, liability, data sources and exceptions is done using real samples, and the presentation is not used as a substitute for production evidence.

IMPLEMENTATION PATH

Suggested paths for improvement

  1. 1
    Draw current process with a real task

    Selecting recent and representative tasks and anomalies, identifying participants, input outputs, time and current costs.

  2. 2
    Delete duplicate transmissions and specify responsibilities and time frames

    Distinction between actions that are self-executing, that require manual confirmation and that prohibit automatic processing.

  3. 3
    Documenting rules, alerts and upgrading mechanisms in the system

    Start with the draft, a copy or a limited scene, and keep the abnormal transferer and retreat.

  4. 4
    Continuous re-entry waiting times, return to work and anomalies

    Continuous observation of accuracy, adoption, processing cycle, error and real business results.

ACCEPTANCE

How to automate the receipt and inspection is really effective.

The acceptance cannot be based solely on whether a single demonstration runs. The following results should be observed continuously using independent samples and real anomalies, and pre-modification baselines of the same calibre should be maintained:

  • Whether the end-to-end cycle declines
  • Whether overdue missions are detected in advance
  • Whether cross-sectoral responsibilities can be tracked
  • Can abnormality be closed and not repeated?

The authorization, approval, audit and manual takeover must also be verified when it comes to the amount, customer commitment, privacy, compliance, production change or deletion operations.

RELATED RESOURCES

Continue to learn about the programmes

More details
Focus of the lesson
  • The real reason for not using the system
  • How to distinguish between training and product issues
  • How does the rate of adoption continue to improve after the line?
Principles of implementation

The manual approval, log and back check are maintained for high-risk actions.