Home / FAQs / Applet, APP, SaaS and old systems
QUESTION & ANSWER

App Development Cost and Process

The costs of the APP depend on the number of platforms, business processes, equipment capabilities, back-office systems, off-line requirements and up-boarding responsibilities. Mobile displays are not the same level as complex on-site APs, which also handle positioning, photographing, scrutinizing, pushing, weak webs and data synchronization.

Answer the question.

First, give conclusions that can be used for decision-making

The costs of an enterprise's APP are usually composed of mobile end, service end, management backstage and external interfaces. If you require support for iOS, Android or Hongmont, you must also judge whether the cross-end framework is suitable for camera, bluetooth, positioning, push and backstage operations.

DECISION FACTORS

What conditions need to be identified before judgement is made?

The same question may have different answers under different business, data and project phases. It is suggested that the following conditions be checked and that the common findings on the web be incorporated into their own projects.

Platforms, models and operating system versions supportedWhether to call location, camera, swipe, bluetooth or NFCWhat tasks must continue to be performed when we're weak and offline.Whether backstage, information, up-to-air, privacy and mobility are included in the range
ACTION STEPS

Suggested order of advance

01

First, we'll be clear about the target and the border.

The three to five mobile tasks with the highest frequency per day were identified through user interviews.

02

Validation Key Dependence

Technical validation of key page prototypes and equipment capabilities completed.

03

Development of assessable outcomes

Login, data synchronization and core business closed loops are developed and supplemented by supporting functionality.

04

Make sure you decide the next step with the real results.

Test it with real equipment and a network environment, and then prepare for distribution at the store.

PRACTICAL EXAMPLE

How do you understand it in the actual business?

Example used to illustrate the method of judgement

The inspection of the AP is functioning properly under the office Wi-Fi, and does not represent the underground area of the plant. The project should simulate the offline photographing, scrutinizing, and task submission in advance, ensuring that the sequence is synchronized and not duplicated after the network is restored.

COMMON RISKS

The easiest pit to step on.

Copy all PC features, resulting in complex movement-end operations

Only a small number of developers tested, no real equipment compatible list

Ignore shop audits, privacy statements and account ownership

ACCEPTANCE

How should we end up receiving and confirming?

The enterprise should obtain code, signature and release rights, interface documents, construction instructions and store account control.

When preparing to communicate with suppliers or internal teams, it is recommended that current processes, representative samples, existing systems, planning time and budget levels be brought. First, the unknown items are clearly marked, and then the decision is made to use diagnostics, PoC, fixed-range projects or ongoing research and development, which is usually more reliable than a direct demand for a price and duration without borders.

Your project conditions are different from the examples above?

Operational objectives, existing systems, sample and planned time could be collated before consultants could make preliminary judgements in relation to actual boundaries.

Contact
EmailWhatsApp