Home / Project Guides Internet technology architecture

Monolith vs. Microservices

Micro-services are not naturally more advanced than mono-systems. For most enterprises, structures that can be stable, understandable, and match team competencies are the best options at this stage.

ContactProject Guides
More details
Single architecture or micro-services? Technical selection criteria for enterprise systems

The advantage of a single structure is simple and centralized.

Single-body applications are short deployment paths, direct transaction processing, easy to debug, suitable for a stage where the scope of operations is clearer, the team size is smaller and the product is still being quickly validated.

Through clear modular boundaries, stratification and automated testing, well-structured monomer systems can equally evolve over time.

Microservices address scale collaboration and independent evolution.

Microservices can reduce interactions, achieve independent deployment and flexible expansion when the business area is complex, multiple teams need to develop in parallel, and the volume and pace of different modules vary significantly.

It also introduces the complexity of network access, distributed services, service governance, monitoring and deployment, which requires a mature engineering base.

I'll use five questions to determine whether to split.

The stability of the operational boundary, the availability of independent and responsible teams, the frequency of the issuance of conflicts, the apparent variation in local capacity and the ability of the platform to support service governance can be assessed.

If these problems are largely unworkable, early fragmentation tends to turn internal code complexity into distributed complexity.

  • Whether operational areas can be clearly delineated
  • Is the team independent and accountable?
  • Is there a significant local performance bottleneck?
  • Availability of automated deployment and observational capabilities
  • Whether the revenue from the split is higher than the long-term governance costs

The more secure path is modular monomer evolution.

Enterprises can first establish strict modular boundaries within a single body, harmonize interfaces and data access rules.

The core of the architecture evolution is not one-off choice of the endpoint, but rather the maintenance of clear borders and manageable costs of change.

Implementation table

Convert single structure from reading conclusions to project input

The most likely problem after reading methodological articles is the acceptance of principles, which are not translated into the next step. It is proposed that the head of operations organize a 60-90-minute mini-workshop, choosing only one real process and not rushing to discuss the full platform.

Step 1: Establishment of a current status and sample baseline

The advantage of a single-body structure is to be simple and centralized, extracting recent normal, unusual and border tasks, recording monthly processing, waiting times, actual processing time, back-to-work rates, manual contact points, error consequences and current tools. If data are insufficient, it is possible to record a period of one to two weeks, but with a reference to sample cycles and operational fluctuations. Do not set a good rate of savings first, then reverse the data.

Step 2: Clarifying the initial closure and inaction

The first phase of the project, which is to be combined with “maximized collaboration and independent evolution”, is to write the first phase of input, processing, output, role use and completion. The system that must be accessed, information required from clients, high-risk matters that cannot be handled automatically and conditions that depend on third parties are listed separately. The first phase is to allow a chain to run and be retraceable, rather than to stack all the microservice structures, technology options, software architecture designs into the same version.

Step 3: Match technical results to engineering evidence

The structure determines the need for a tracking relationship between the number of the demand, sample number, test results and version, based on “divide down with five questions”. The structure determines the amount of capacity, peaks, availability, recovery time, frequency of distribution and failure data to avoid introducing complexity that exceeds the team capacity too early for technological advances.

Step 4: Receiving, inspection and disking with the same calibre

Assuming that the original process handles 600 tasks per month, an average of 20 minutes and a return rate of 10 per cent, the target can be stated as “six weeks after the start-up, with a reduction of 25 per cent on average, and a return rate of no higher than the original baseline, given the close complexity of the task.” This set only demonstrates the measurement method, and does not represent any client outcome; the official indicator must be identified by the enterprise on the basis of its own sample.

  • Operational material: flowchart, role, sample mission, current issues and baseline data
  • Technical material: system inventory, interface, data access, deployment environment and security requirements
  • Project material: first-phase scope, exclusions, liability matrix, milestones and change mechanisms
  • Receiving and inspection material: test set, execution records, list of deficiencies, indicator queries and handover documents

When these materials are identified jointly by both the operational and technical parties, the method in the article is actually entered into the project. If key data, interface authorization or the responsible person are not in place, the logical next step is usually a limited diagnostic or PoC, rather than an immediate commitment to complete the work period and fixed total price.

Core elements

Implement methodology to project action

  • Simple is not behind. Matching is the most important thing.
  • Micro-services require a combination of operational and engineering capacity
  • Prioritize modular design and split it by real pain points
Related issues

Continuing to reconcile common issues in project decision-making

Business Info, Systems integration and Transport

How do third party API integrated and multi-system interface development generally offer?

The interface project cannot simply be quoted by the number of interfaces, as the same interface may be simply a query, but may also assume transaction, retest, reconciliation and security responsibility. The cost depends on the quality of the document, the test environment, field conversion, synchronization frequency, unusual compensation, performance and online support. It is recommended that the number of URLs be assessed by business links rather than counting only. The unknown interface can be technically validated and then formally quoted.

View full answer
Corporate information selection, integration and data governance

Can the API interface be fully compatible without a file?

Sometimes, but costs, risks and time increase significantly, and no certain connection can be promised. Teams need to confirm whether there is a legal mandate, test environment, logs, sample requests and original support.

View full answer
Corporate information selection, integration and data governance

How do you monitor interface failure and data discrepancies after systems integration?

The interface returns successfully and does not amount to a business process completion, and systems integration must monitor both the technical state and the results of the operation. Each request must have a unique tracking number, recording the source, target, state, time-consuming, retry, and business unit number. Payments, orders, inventory, etc., are also regularly reconciled. Aberrants must be entered into a retried, reimbursable or manual processing queue and not remain in the log.

View full answer
Contracts, payments, changes and project delivery

What information is required for the software project acceptance and inspection?

The objective of the information is to demonstrate that the system meets agreed standards and that the client can continue to operate and take over.

View full answer
Professional services for ZhiHua Tech

Need for further analysis in the context of the current state of the enterprise?

We provide IT technical advice, enterprise information construction, Software Project Outlook, product design, R & D delivery and systems delivery services.

Liaison consultants
Content liability statement
Content liability statement

The publication body: Shanghai, like the ZhiHua Tech. This paper is used for technical and project decision-making purposes; facts, data and external perspectives are presented on page and can be verified in scope and do not constitute a commitment to the results of a specific project.Checking content clearance, source of information and correction policy

Extending Reading

More Internet technical architecture articles

Enter the topic 's front page
EmailWhatsApp