PROJECT DECISIONS
Existing-system AI integration: implementation and acceptance
Review integration readiness, not just interface count
Review API documentation, test environments, authentication, limits and vendor support. Distinguish real-time APIs, events, batch files and read-only views; check legacy fields and unique business IDs. If only UI operation is available, assess browser automation separately, including page changes, login and error risks. Do not assume it is as stable as a supported API.
Read-only features still need access and freshness controls
For example, a project-risk summary may use only projects the user can view and should show the data's update time. Test role differences, account deactivation and permission changes. A restricted button is not enough if the backend can still retrieve all records. Do not summarize confidential data across client or departmental boundaries.
Validate writes and provide recovery paths
Separate model recommendations from execution. Before a write, validate the record version, required fields, idempotency key and approval state. After a timeout, check whether the action completed before retrying. Repeated requests must not create duplicate orders or notifications.
Protect existing workflows during staged rollout
Run regression tests against API contracts and representative samples for each release. Agree compatibility checks and notification arrangements for source-system changes. A single successful connection does not establish permanent availability; retain a way to disable the AI feature without blocking the original workflow.
Acceptance checks and repeatable evidence
The following are suggested project checks, not client results or a universal performance guarantee. Agree thresholds and test data for the specific project.
| Checkpoint | How to verify | Interpretation notes |
|---|
| Write-back consistency | Simulate duplicate requests, timeouts and concurrent updates. | Check the resulting business record, not only the HTTP status code. |
| Inherited permissions | Compare the same user's permitted records in the source system and AI layer. | Verify that revoked permissions also invalidate cached and retrieved access. |
| Fallback operation | Disable the AI dependency and run the original business workflow. | Check data integrity, manual access and recovery ownership. |