Production, supply chain and quality

Product Quality Batch Traceability

The problem can only be traced manually, and the range of recall is too high or missing. The enterprise should establish a positive and reverse batch trace and verify whether the key nodes are actually collected.

ZhiHua Tech Original Course2 minutes 23 secondsFAQs and solutions in enterprise informatization

This video is used for enterprise-infomatic knowledge learning and internal discussions.

DIRECT ANSWER

Let's see what we can do.

The problem can only be traced manually, and the range of recall is too high or missing. The enterprise should establish a positive and reverse batch trace and verify whether the key nodes are actually collected.

VIDEO NOTES

The video content of this issue is read

The following are structured textual interpretations of the video for the current period, which allow for quick reading, internal discussion and search; it is not a word-for-word subtitle. Around “product problems, why not find out which clients are affected”, it is suggested that a distinction be made between appearances, business causes and system improvements before deciding whether process adjustments, data governance, system integration, automation or customization development are required.

1. At which points the batch chain is easily broken

The problem can only be traced manually, and the range of recalls can be over-repeated or missing. The enterprise should establish a positive and reverse batch and verify whether the data of the key nodes are actually collected.

2. What are the problems being solved separately from the problem of retroactive treatment?

The problem can only be traced manually, and the range of recalls can be over-repeated or missing. The enterprise should establish a positive and reverse batch and verify whether the data of the key nodes are actually collected.

3. How the retroactive system is performed for acceptance and acceptance

The problem can only be traced manually, and the range of recalls can be over-repeated or missing. The enterprise should establish a positive and reverse batch and verify whether the data of the key nodes are actually collected.

WORKFLOW DESIGN

What should we do with this scene?

Dealing with planned changes, inventory discrepancies, duplicates of quality, drawing versions, equipment shutdowns, procurement logistics and batches is retroactive. “Property problems arise, why no customer is affected”, first defining real input, desired output, tool privileges, manual clearance, unusual handling and operational acceptance indicators, then deciding whether to use rules, scripts, API, Codex or other AIAgent.

01Which nodes are easier to break in the batch chain?

The verification of conditions, liability, data sources and exceptions is done using real samples, and the presentation is not used as a substitute for production evidence.

02What are we going to resolve retroactively?

The verification of conditions, liability, data sources and exceptions is done using real samples, and the presentation is not used as a substitute for production evidence.

03How the retroactive system works on acceptance and acceptance.

The verification of conditions, liability, data sources and exceptions is done using real samples, and the presentation is not used as a substitute for production evidence.

IMPLEMENTATION PATH

Suggested paths for improvement

  1. 1
    Harmonization of material, product, process and supplier master data

    Selecting recent and representative tasks and anomalies, identifying participants, input outputs, time and current costs.

  2. 2
    Connect plan, inventory, production, quality and equipment status

    Distinction between actions that are self-executing, that require manual confirmation and that prohibit automatic processing.

  3. 3
    Create batch, version and unusual retroactive chain

    Start with the draft, a copy or a limited scene, and keep the abnormal transferer and retreat.

  4. 4
    Continuous improvement in the use of delivery, quality, inventory and cost indicators

    Continuous observation of accuracy, adoption, processing cycle, error and real business results.

ACCEPTANCE

How to automate the receipt and inspection is really effective.

The acceptance cannot be based solely on whether a single demonstration runs. The following results should be observed continuously using independent samples and real anomalies, and pre-modification baselines of the same calibre should be maintained:

  • Reduction in the number of accounts and planned implementation discrepancies
  • Whether quality and equipment issues are root-caused closed loops
  • Whether the version and batch are traceable at the end of the course
  • Early warning of procurement, logistics and delivery anomalies

The authorization, approval, audit and manual takeover must also be verified when it comes to the amount, customer commitment, privacy, compliance, production change or deletion operations.

RELATED RESOURCES

Continue to learn about the programmes

More details
Focus of the lesson
  • Which nodes are easier to break in the batch chain?
  • What are we going to resolve retroactively?
  • How the retroactive system works on acceptance and acceptance.
Principles of implementation

The manual approval, log and back check are maintained for high-risk actions.

Information for Consulting Enterprises Programme
EmailWhatsApp