Home / Services / Information-based diagnosis, systematic planning and digital transformation services for SMEs
PROFESSIONAL SERVICE

Enterprise Information

SMEs should be informed by end-to-end business processes, prioritizing the re-engineering of the links that most affect income, delivery, inventory or repayment, linking systems, data and organizations, and allowing technology inputs to genuinely improve synergies, costs and business decisions.

Core process online closed loopBetter cross-sectoral synergiesProgressive harmonization of data calibresBusiness problems come to light earlier.
Enterprise Infobusiness interface with driver's seat management

Problems that enterprises usually face

Process standards are inconsistent and accountability and progress difficult to track

Same data is maintained repeatedly in multiple systems

The system is functional, but not used in practice.

Business analysis relies on manual aggregation, with delayed feedback

Our core services

01

Improved diagnosis, problem baseline and project priorities for SMEs

02

Business process combing and 3 to 6 months of information road map

03

CRM, ERP, OA, write-off and business platform building

04

Standard product procurement, secondary development and custom route comparison

05

Main data, access, approval and information system planning

06

Existing systems integration, data migration and business analysis

Project deliverables

The final delivery boundaries are defined according to the scope of services, the construction phase and the modalities of cooperation, and are described below as common results.

DELIVERABLEDiagnosis and priority report on the status of informatization
DELIVERABLEBusiness processes, system responsibilities and data blueprint
DELIVERABLEPhased road map and budget levels
DELIVERABLERequirements specifications, system architecture and running software
DELIVERABLEReceiving and inspection baseline, deployment training and transport documentation

How the project budget is assessed

Service coverage and business closure for the first phase: ICT diagnosis for SMEs, problem baseline and project priorities, business process combing and 3 to 6 months ICT road map

Level of integrity of existing codes, data, systems, equipment and documents, and scope of coverage to be audited, relocated or re-engineered

Number of third-party interfaces, coordination responsibilities, data quality, unusual compensation and external supplier cooperation

Non-functional requirements such as performance, availability, security, authority, audit, compliance and access windows

Delivery depth and long-term responsibility: requirements specifications, systems architecture and operating software, acceptance baseline, deployment of training and transport documentation, and quality assurance, peacekeeping continuity range

These circumstances do not recommend immediate initiation of full development.

Project objectives, responsible persons and acceptance criteria are not established

Key accounts, data, interfaces or business authorizations not available

Only the maximum price or very short cycle is sought, and the necessary tests and quality control are not accepted

IMPLEMENTATION PLAYBOOK

How to move from demand to acceptable outcomes for the information and digitalization of enterprises

The following are used to explain the implementation methodology, the data calibre and the boundaries of responsibility, and are not used as a proxy for project judgement by functional lists.

Keywords and description of content

This page contains organizational content on real service issues such as the ICT diagnosis of SMEs, SME ICT construction, enterprise ICT planning, and business ICT transformation. Keywords are used to help users and search systems identify themes, without representing commitments to fixed effects; final scope, periodicity, budget and indicators are based on project diagnosis, contracts and acceptance baselines.

DELIVERY PATH

Implementation and delivery pathways

Each stage has clear objectives, participatory roles and assessable outcomes, and important decisions are not left to the end of the project.

01Business diagnostics
02Blueprint planning
03Prototype confirmed.
04Phased construction
05Operational optimization
FAQ

FAQs

The most common issues before cooperation are clearly stated in advance.

Which system should inform enterprises first?+

It should start with the current business chain that most affects income, delivery, cost or risk, rather than simply following the fixed order of CRM, ERP, OA.

Can we talk about the current system?+

Yes. The project will first combo the system interface, data quality, rights and liability boundaries, then select the API, message, data synchronization or integration platform.

How do you guarantee staff willingness to use the system when it is online?+

(c) Involve key users in the process and prototype appraisal at the design stage, with training, access, data initialization and operational indicators on line, and continuously optimized on the basis of feedback.

DECISION FAQ

Common issues related to current projects

Check out all 265 questions.
Corporate information selection, integration and data governance

How should data inconsistencies in multisystems be addressed?

The client, commodity, organization, inventory and order may be the primary responsibility of the different systems, with clear coding, calibration, synchronization and timing. Historical differences require an inventory, cleansing and manual validation, and no batch script can be used to conceal the root causes.

View full answer
Business Info, Systems integration and Transport

Which system should SMEs use first for informationization?

The process is used to prioritize mature products, requiring differentiated capabilities or complex integration before customisation is considered. The first target is to generate end-to-end closed loops and credible data, rather than to cover all sectors at a time. Management must designate the business leader and a single calibre.

View full answer
One-man company and OPC technical support

Does a company need a CRM, project management and knowledge base?

Whether or not information is complex is not the number of companies. When clients exceed memory control, the project has multiple nodes, and the programme needs to be reused, the corresponding system should be put in place; but the three capabilities need not be provided by three heavy platforms.

View full answer
One-man company and OPC technical support

How should data be integrated when dispersed using multiple AI tools?

First, identify the primary data system of clients, projects, contracts and knowledge, then position other AI tools as callers or processors, rather than keep a single primary record for each tool. Prioritize the use of official API, Webbook or regular export of synchronized fields, and harmonize customer and project identification. For unexportable closed tools, the risk of migration should be assessed and the critical business assets avoided.

View full answer
RELATED

Services, guidance and cases

Get your advice.